Call us on telephone icon 01226 785 722

News

8th February 2024

The team have done a fantastic job on this project!!

Team Trenchless were employed to install a 610mm steel carrier casing then install a 560mm SDR11 PE pipe from the 6.5m shaft to the underground tank within the WTW.

Line and grade was paramount on this project so TSL opted to use the accuracy of our guided auger boring rig.

If you have or think you may require our assistance on your next project contact the team.

Trenchless Solutions Limited own and operate the largest fleet of hashtagaugerboring equipment withing the Uk, we can help you with your next project from conception through to completion

 

Share



Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT