TS Guided Rod Pro – Taylor Lane

Project Overview
A section of a DN150 vitrified clay foul water sewer at a depth of approx. 2 metres had collapsed
underneath the extension of a property running from the front to rear gardens, between structural
supporting ground piles.

Description of Works
By utilising the TS Guided Rod Pro, we strategically set it alongside the existing foul sewer pipe,
maintaining a 200mm separation to ensure precision. The pilot bore was tracked and guided from
above ground through the property using a sonde within the drill head with remarkable accuracy
to maintain the line, level and constant gravity falls, seamlessly reaching our desired position at the
back of the property.
The new 110mm PE pipe was efficiently attached to the rear of the expansion head and
successfully pulled back into place at the launch pit. Once the rig was lifted out of the excavation,
this allowed necessary connections into the outfall and reinstatement.

 

 

Proposed  Open Cut Construction  As Built Trenchless Construction

Restricted Access:

  • Tight working space, no room to open cut
  •  Residential street, restricted access for residents

Restricted Access:

• Access maintained

Health & Safety:

• Temporary Deep Trenches
• Increased Temporary Works

Health & Safety:

• No Temporary Deep Trenches
• Reduced Temporary Works

Cost Savings:

• Mitigation
• Over-Pumping
• Duration of Project
• Material Reinstatement Costs, Tipping / Inert

Cost Savings:

• No further mitigation
• Reduced Time of Over-Pumping
• Reduced Duration of Project
• Reduced Material Reinstatement Costs

Environmental:

• Noise

Environmental:

• Reduced Noise